A.5天B.5個(gè)工作日C.7天D.7個(gè)工作日
A.監(jiān)理大綱、監(jiān)理規(guī)劃、實(shí)施細(xì)則、會(huì)議紀(jì)要、監(jiān)理月報(bào)等28類監(jiān)理資料, B.施工合同文件、監(jiān)理規(guī)劃、實(shí)施細(xì)則、會(huì)議紀(jì)要、監(jiān)理月報(bào)等28類監(jiān)理資料, C.開工/復(fù)工令、監(jiān)理規(guī)劃、實(shí)施細(xì)則、會(huì)議紀(jì)要、監(jiān)理月報(bào)等26類監(jiān)理資料, D.監(jiān)理規(guī)劃、實(shí)施細(xì)則、會(huì)議紀(jì)要、監(jiān)理月報(bào)、監(jiān)理日記等23類監(jiān)理資料,
A.監(jiān)理人應(yīng)在收到承包人進(jìn)度付款申請(qǐng)單后12天內(nèi)完成核查, B.進(jìn)度付款申請(qǐng)單中應(yīng)包括變更金額和索賠金額, C.發(fā)包人應(yīng)在監(jiān)理人收到進(jìn)度付款申請(qǐng)單后的24天內(nèi),將進(jìn)度應(yīng)付款支付給承包人, D.監(jiān)理人出具進(jìn)度付款證書,應(yīng)視為監(jiān)理人已同意、批準(zhǔn)或接受了承包人完成的該部分工作,