Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()
Companycom is installing a Virtual IO Server to reduce the number of fibre channel adapters needed for each partition. The customer wants to use disk based copy functions to replicate the data on the LUNs. How can this be accomplished?()
A just announced two-port Ethernet card has been installed on a system and it is not recognized. On the HMC the slot shows empty. The device driver has been installed and cfgmgr runs normally. What is the most appropriate action to solve this problem?()
广告位招租 联系QQ:5245112(WX同号)
关于我们 | 付款方式 | 广告联系 | 联系我们 | 网站地图 | 网站申明 | 友情链接 | 网站招聘 | 帮助中心
版权所有©考试资料网(ppkao.com) 长沙求知信息技术有限公司 All Rights Reserved
扫一扫免费做题