      單項(xiàng)選擇題

      【共用題干題】

      Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.

      空白(1)處填()

      A.accuracy
      B.approximation
      C.specification
      D.summary

      題目列表

      你可能感興趣的試題

      • 單項(xiàng)選擇題

        【共用題干題】

        (1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.

        空白(3)處填()

        A.F-S
        B.F-F
        C.S-F
        D.S-S

      • 單項(xiàng)選擇題

        【共用題干題】

        (1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.

        空白(2)處填()

        A.F-S
        B.F-F
        C.S-F
        D.S-S

      掃碼聯(lián)系掃碼聯(lián)系在線客服
      反饋使用問(wèn)題
      掃碼練習(xí)掃碼使用小程序
      手機(jī)掃碼

      版權(quán)所有?考試資料網(wǎng)(ppkao.com) All Rights Reserved

      • 聯(lián)系客服
      • 小程序
      • 桌面端下載
      • 回到頂部

      感谢您访问我们的网站,您可能还对以下资源感兴趣:

      手机毛片在线